Installation gas pipeline of VJG plant in Vung Tau

Phuc Sang Minh Gas Engineering co,.Ltd (JPS) design, purchase materials, construct installation gas pipeline for Viet Japanese factories (VJG) Phu My industrial zone – Vung Tau.

The job categories Phuc Sang Minh Gas has done in the project include three phases:
Phase 1: Construction of a gas pipeline 8 “long 3267 meters from Vietnam Japan Gas Plant (VIJAGAS) to Vietnam Steel plant at Phu My Industrial Zone, Ba Ria Vung Tau.
Phase 2: Gas line long 2557 meters from Vinakyoei plant in Phu My Industrial Zone to My Xuan A2 industrial zone to Vietnam Steel factory.
Phase 3: Gas line long 2520 meters from China Steel in My Xuan A2 industrial zone to Vietnam – Japan in My xuan A1 industrial zone.
Hydrogen-line: 2 1/2 ”
Nitrogen – line: 10 ”
Oxygen gas Route: 5 “

Owner: VJG Vietnam – Japan Gas Company
Location: Vung Tau – Phu My industrial zone.
Duration: 2012
The project fully meets the general criteria for quality (ISO 9001 & SNT-TC), standard of pipe systems, equipment and safety standards.

Installation gas pipeline

Installation gas pipeline of VJG plant in Vung Tau

Installation gas pipeline of VJG plant in Vung Tau

Installation gas pipeline of VJG plant in Vung Tau

Installation gas pipeline of VJG plant in Vung Tau
Installation gas pipeline of VJG plant in Vung Tau

Others Complete projects

Gas system The Canary

The contractor JPS design, provide, install for central gas system (LPG) for Canary residential in...

Gas system Sunrise City

Apartment and commerce project - Sunrise City include 6 buildings with area of ​​over 20,000...