Gas metering system of Ca Mau Fertilizer Plant

In 2010, Phuc Sang Minh Gas Engineering Co., Ltd supplied and installation gas metering system for gas line project of the Ca Mau Fertilizer factory. This work is a part in metering skid system construction plan, a cluster of relief valve, shut off emergency regulator, control system, industrial pipeline system in station, gas system and 700m pipe’s 10 inch through the Ca Mau Fertilizer factory.

The project to build the line of supplying gas for Ca Mau fertilizer factory is construction that was invested aimed at providing about 500 million m3 gas/year for Ca Mau Fertilizer factory. The Purpose meets the demand’s fertilizer production in the high capacity about 800,000 ton/year. This is the third line of supplying gas in Ca Mau gas distribution center beside two ones for power plant of Ca Mau 1 and Ca Mau 2.

Project time: 2010

Gas metering system

Gas metering system of Ca Mau Fertilizer Plant

Gas metering system of Ca Mau Fertilizer Plant

Gas metering system of Ca Mau Fertilizer Plant
Gas metering system of Ca Mau Fertilizer Plant

Others Complete projects

Gas system The Canary

The contractor JPS design, provide, install for central gas system (LPG) for Canary residential in...

Gas system Sunrise City

Apartment and commerce project - Sunrise City include 6 buildings with area of ​​over 20,000...